tata steel – port talbot

The project with Dawnus Construction was phased into three developments, Training Centre, Visitor Centre, Offices and storage facility. All designed to be zero carbon buildings run entirely on free heating, electricity and hot water. Harnessing the waste energy produced during the manufacture of steel on site, in the form of flare gas and steam.

project details

Location

Port Talbot

Completion date

2012/2013

Contractor

Dawnus Construction

Architect

Powell Dobson

Suppliers

AluK (Previously Blyweert)